Construction of the 7th Main Tower Curve of Chaobai River Bridge by China Railway Major Bridge Bureau Sixth CompanyelevatorInstallation successful.
The main tower of Chaobai River Bridge is 102.12 meters high, with high construction risks and technical content. In order to ensure the safety of construction personnel, accelerate construction progress, and improve construction efficiency, the project department installed a construction elevator on the main tower.
This curved construction elevator is designed and manufactured based on the alignment and on-site construction needs of the 7th main tower of Chaobai River Bridge, and is the first curved construction elevator in North China.